Quote:
	
	
		| 
					Originally Posted by Rich  The clock always starts on the RFP after an IW. | 
	
 Then what's the significance of the qualifying phrase, "if the clock was stopped for any reason other than specified in Rule 3-4-3 or an untimed down"?  Doesn't that mean that if the clock is stopped for reasons specified in 3-4-3, that would supersede 3-4-2(c), and the clock would start on the snap?