A Lead is needed to officiate the post and the end line.
Trail can adjust positioning to be either Trail or Center oriented based on coverage needs.
Lead needs to rotate when needed. Trail needs to crossover halfway point when needed.
That's all that is needed.
__________________
A-hole formerly known as BNR
|