Team Technical ...
Quote:
Originally Posted by griblets
Team technical per 10-2-1b
|
10-2 Team Technical
Art. 1 Allow the game to develop into an actionless contest, this
includes the following and similar acts:
c. Commit a violation of the throw-in boundary-line plane, as in 9-2-
10, after any team warning for delay.
9-2-10 The opponent(s) of the thrower shall not have any part of
his/her person through the inbounds side of the throw-in boundary-line
plane until the ball has been released on a throw-in pass.
Penalties: (Art. 10)
1. The first violation of the throw-in boundary-line plane by an
opponent(s) of the thrower shall result in a team warning for delay
being given (one delay warning per team per game). The warning does
not result in the loss of the opportunity to move along the end line
when and if applicable.
2. The second or additional violations will result in a technical foul
assessed to the offending team. See 10-2-1c Penalty.
__________________
"For God so loved the world, that he gave his only begotten Son, that whosoever believeth in him should not perish, but have everlasting life." (John 3:16)
“I was in prison and you came to visit me.” (Matthew 25:36)
|